FS25 operations consoleBaseline v1.21.1.0 // reviewed 2026-08-22

FIELD OPERATIONS

Field work time calculator

Estimate realistic working time, hectares per hour, fuel use and cost before assigning a machine to the field.

Machine plan

Field and implement

Area unit

Work estimate

Field capacity

TIME MODEL
Total working time0 h0 hours 0 minutes
Effective capacity
0 ha/h
Capacity in acres
0 ac/h
Fuel required
0 L
Fuel cost
$0
Machine operating cost
$0
Working days
0 days
Efficiency includes real field losses

Headland turns, overlaps, refills, unloading and obstacles reduce capacity. Use 65 to 80 percent for irregular fields and 80 to 90 percent for simple fields with few stops.

Capacity formula

Width alone does not set the finish time

Theoretical capacity in hectares per hour equals working width in meters multiplied by speed in kilometers per hour, divided by 10. Effective capacity applies the efficiency percentage before field area and passes are divided by it.

The estimate is useful for comparing equipment, contracts and helper schedules. Transport to the field and setup time are not included unless you reduce efficiency or add them to the final result.